Flood risk management strongly relies on inundation models for river basin zoning in flood-prone and risk-free areas. Floodplain zoning is significantly affected by the diverse and concurrent uncertainties that characterize the modelling chain used for producing inundation maps. In order to quantify the relative impact of the uncertainties linked to a lumped hydrological (rainfall–runoff) model and a FLO-2D hydraulic model, a Monte Carlo procedure is proposed in this work. The hydrological uncertainty is associated with the design rainfall estimation method, while the hydraulic model uncertainty is associated with roughness parameterization. This uncertainty analysis is tested on the case study of the Marta coastal catchment in Italy, by comparing the different frequency, extent and depth of inundation simulations associated with varying rainfall forcing and/or hydraulic model roughness realizations. The results suggest a significant predominance of the hydrological uncertainty with respect to the hydraulic one on the overall uncertainty associated with the simulated inundation maps.

Annis, A., Nardi, F., Volpi, E., Fiori, A. (2020). Quantifying the relative impact of hydrological and hydraulic modelling parameterizations on uncertainty of inundation maps. HYDROLOGICAL SCIENCES JOURNAL, 65(4), 507-523 [10.1080/02626667.2019.1709640].

Quantifying the relative impact of hydrological and hydraulic modelling parameterizations on uncertainty of inundation maps

F. Nardi;
2020-01-01

Abstract

Flood risk management strongly relies on inundation models for river basin zoning in flood-prone and risk-free areas. Floodplain zoning is significantly affected by the diverse and concurrent uncertainties that characterize the modelling chain used for producing inundation maps. In order to quantify the relative impact of the uncertainties linked to a lumped hydrological (rainfall–runoff) model and a FLO-2D hydraulic model, a Monte Carlo procedure is proposed in this work. The hydrological uncertainty is associated with the design rainfall estimation method, while the hydraulic model uncertainty is associated with roughness parameterization. This uncertainty analysis is tested on the case study of the Marta coastal catchment in Italy, by comparing the different frequency, extent and depth of inundation simulations associated with varying rainfall forcing and/or hydraulic model roughness realizations. The results suggest a significant predominance of the hydrological uncertainty with respect to the hydraulic one on the overall uncertainty associated with the simulated inundation maps.
2020
Pubblicato
Rilevanza internazionale
Articolo
Esperti anonimi
Settore CEAR-01/B - Costruzioni idrauliche e marittime e idrologia
English
Annis, A., Nardi, F., Volpi, E., Fiori, A. (2020). Quantifying the relative impact of hydrological and hydraulic modelling parameterizations on uncertainty of inundation maps. HYDROLOGICAL SCIENCES JOURNAL, 65(4), 507-523 [10.1080/02626667.2019.1709640].
Annis, A; Nardi, F; Volpi, E; Fiori, A
Articolo su rivista
File in questo prodotto:
File Dimensione Formato  
2020_Annis et al (HSJ) Quantifying the relative impact of hydrological and hydraulic modelling parameterizations on uncertainty of inundation maps.pdf

solo utenti autorizzati

Tipologia: Versione Editoriale (PDF)
Licenza: Copyright dell'editore
Dimensione 3.5 MB
Formato Adobe PDF
3.5 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2108/397994
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 39
  • ???jsp.display-item.citation.isi??? ND
social impact