A geographically distibuited software project needs to have a well defined software integration {\amp development plan to avoid extra work in the pipeline creation phase. Here we will describe the rationale in the case of the Planck/LFI DPC project and what was designed and developed to build the integration and testing environment. }
Zacchei, A., Vuerli, C., Maino, D., DE GASPERIS, G., Pasian, F. (2004). Planck/LFI DPC pipeline integration and testing. In Society of Photo-Optical Instrumentation Engineers (SPIE) Conference Series (pp.747-755) [10.1117/12.550778].
Planck/LFI DPC pipeline integration and testing
DE GASPERIS, GIANCARLO;
2004-01-01
Abstract
A geographically distibuited software project needs to have a well defined software integration {\amp development plan to avoid extra work in the pipeline creation phase. Here we will describe the rationale in the case of the Planck/LFI DPC project and what was designed and developed to build the integration and testing environment. }File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.