In this paper, we illustrate a new method to overcome the failures of the theory proposed by Elmaghraby and Kamburowski (1992) and De Reyck (1998) for the analysis of activity criticalities and flexibilities in non-preemptive project scheduling with generalized precedence relations under unlimited resources. These failures, discussed in detail in this paper, call for a new approach to study this problem. We provide new definitions of criticalities and consequently new tools for their identification within a more general framework without ambiguities.
Bianco, L., Caramia, M., Giordani, S. (2022). Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 298(2), 451-462 [10.1016/j.ejor.2021.07.022].
Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities
Bianco L.;Caramia M.;Giordani S.
2022-01-01
Abstract
In this paper, we illustrate a new method to overcome the failures of the theory proposed by Elmaghraby and Kamburowski (1992) and De Reyck (1998) for the analysis of activity criticalities and flexibilities in non-preemptive project scheduling with generalized precedence relations under unlimited resources. These failures, discussed in detail in this paper, call for a new approach to study this problem. We provide new definitions of criticalities and consequently new tools for their identification within a more general framework without ambiguities.File | Dimensione | Formato | |
---|---|---|---|
BiancoEtAl(2021)Pre-proof.pdf
accesso aperto
Descrizione: Bozza di stampa dell'articolo
Tipologia:
Documento in Post-print
Licenza:
Creative commons
Dimensione
1.15 MB
Formato
Adobe PDF
|
1.15 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.