Nicosia, G., Pacifici, A. (2013). Scheduling tasks with comb precedence constraints on dedicated machines. In 7th IFAC Conference on manufacturing modelling, management, and control, 2013 (pp.430-435). Elsevier [10.3182/20130619-3-RU-3018.00530].

Scheduling tasks with comb precedence constraints on dedicated machines

PACIFICI, ANDREA
2013-01-01

19th IFAC World Congress
San Pietroburgo (Russia)
2013
19.
Rilevanza internazionale
2013
Settore MAT/09 - RICERCA OPERATIVA
English
Intervento a convegno
Nicosia, G., Pacifici, A. (2013). Scheduling tasks with comb precedence constraints on dedicated machines. In 7th IFAC Conference on manufacturing modelling, management, and control, 2013 (pp.430-435). Elsevier [10.3182/20130619-3-RU-3018.00530].
Nicosia, G; Pacifici, A
File in questo prodotto:
File Dimensione Formato  
PD_COMB_ifac3.2.pdf

solo utenti autorizzati

Descrizione: Preprint articolo
Licenza: Copyright dell'editore
Dimensione 194.81 kB
Formato Adobe PDF
194.81 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2108/182342
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? ND
social impact