Rome and the Tiber. The Collapse of Sections of the Embankment During the Flood of 1900. Causes and Measures The walls enclosing the Tiber in Rome succeeded in preventing the frequent inundations of the city. The constructive boldness and the size of this technological enterprise highlight the experimentation of a complex hydraulic and geotechnical project, whose testing was made possible by a fortuitous event. In December 1900 a flood tested the stability of the structures built so far, causing the collapse of some sections of the embankments, and suggesting the setting up of a statical upgrade. Indeed, as a result of the high river levels, the retaining structures were exposed to exceptional hydraulic forces. Correspondingly, the foundations soils were subjected to large drag forces by the water flowing at high rate, that developed erosive phenomena. The contribution investigates the causes underlying the collapses and analyzes the structural and construction measures that were later adopted to ensure the stability of the embankments.

D'Amelio, M.g., Federico, F., Cacciotti, M., Grieco, L. (2023). Roma e il Tevere. Il crollo dei muraglioni per la piena del 1900: cause e provvedimenti. LEXICON. STORIE E ARCHITETTURA IN SICILIA, 81-90.

Roma e il Tevere. Il crollo dei muraglioni per la piena del 1900: cause e provvedimenti

D'Amelio M. G.
Conceptualization
;
Federico F.
Conceptualization
;
Cacciotti M.
Conceptualization
;
Grieco L.
Conceptualization
2023-01-01

Abstract

Rome and the Tiber. The Collapse of Sections of the Embankment During the Flood of 1900. Causes and Measures The walls enclosing the Tiber in Rome succeeded in preventing the frequent inundations of the city. The constructive boldness and the size of this technological enterprise highlight the experimentation of a complex hydraulic and geotechnical project, whose testing was made possible by a fortuitous event. In December 1900 a flood tested the stability of the structures built so far, causing the collapse of some sections of the embankments, and suggesting the setting up of a statical upgrade. Indeed, as a result of the high river levels, the retaining structures were exposed to exceptional hydraulic forces. Correspondingly, the foundations soils were subjected to large drag forces by the water flowing at high rate, that developed erosive phenomena. The contribution investigates the causes underlying the collapses and analyzes the structural and construction measures that were later adopted to ensure the stability of the embankments.
2023
Pubblicato
Rilevanza nazionale
Articolo
Esperti anonimi
Settore ICAR/18
Settore CEAR-11/A - Storia dell'architettura
Italian
Roma, Tevere, Embankment
D'Amelio, M.g., Federico, F., Cacciotti, M., Grieco, L. (2023). Roma e il Tevere. Il crollo dei muraglioni per la piena del 1900: cause e provvedimenti. LEXICON. STORIE E ARCHITETTURA IN SICILIA, 81-90.
D'Amelio, Mg; Federico, F; Cacciotti, M; Grieco, L
Articolo su rivista
File in questo prodotto:
File Dimensione Formato  
VIP CROLLI_BR (1).pdf

solo utenti autorizzati

Tipologia: Versione Editoriale (PDF)
Licenza: Copyright dell'editore
Dimensione 2.45 MB
Formato Adobe PDF
2.45 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2108/397197
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact