In this note we show how to manage, by means of Generalized Precedence Relationships, some kinds of temporal constraints introduced by Chen et al. (1997) in project networks.
Caramia, M., Guerriero, F. (2011). A Note on the modeling of project networks with temporal constraints. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 211(3), 666-670 [10.1016/j.ejor.2010.12.020].
A Note on the modeling of project networks with temporal constraints
CARAMIA, MASSIMILIANO;
2011-01-01
Abstract
In this note we show how to manage, by means of Generalized Precedence Relationships, some kinds of temporal constraints introduced by Chen et al. (1997) in project networks.File in questo prodotto: