The Virgo detector has now finished its first science run; a science mode duty cycle of more than 80% and a 4.5 Mpc horizon distance for binary neutron star inspiral sources were achieved. Commissioning breaks were organized during the run which permitted improvement of the sensitivity and the robustness of the interferometer against environmental perturbations like bad weather and earthquakes. The post-run commissioning phase has now started, with the goal of preparing the next upgrade step of the detector, Virgo+.
Acernese, F., Alshourbagy, M., Amico, P., Antonucci, F., Aoudia, S., Astone, P., et al. (2008). Status of Virgo. In Classical and Quantum Gravity. BRISTOL : IOP PUBLISHING LTD [10.1088/0264-9381/25/11/114045].
Status of Virgo
COCCIA, EUGENIO;FAFONE, VIVIANA;Lorenzini, M.;
2008-01-01
Abstract
The Virgo detector has now finished its first science run; a science mode duty cycle of more than 80% and a 4.5 Mpc horizon distance for binary neutron star inspiral sources were achieved. Commissioning breaks were organized during the run which permitted improvement of the sensitivity and the robustness of the interferometer against environmental perturbations like bad weather and earthquakes. The post-run commissioning phase has now started, with the goal of preparing the next upgrade step of the detector, Virgo+.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.